Topographic works division

TOPOGRAPHIC SUPPORT DURING THE CONSTRUCTION OF DOUBLE RAIL NATURAL TUNNEL BETWEEN THE PROGRESSIVE Km 8+008 (MILAN SIDE OF THE NEW HIGH SPEED TRAIN STATION) AND PROGRESSIVE Km 9+280 (BEGINNING OF ARTIFICIAL TUNNEL MILANO SIDE) FOR THE URBAN LINE OF BOLOGNA MILAN NAPLES HIGH SPEED PROJECT (LOT 8A).
Location: Bologna
Years: From 01/12/ 2002 to 31/08 /2011.
Executing company works: Società Italiana Per Condotte D’acqua

TOPOGRAPHIC SUPPORT DURING OF ALL CIVIL WORKS NECESSARY FOR CONSTRUCTION OF RAILWAY BETWEEN THE PROGRESSIVE A.C. 78+985 AND THE PROGRESSIVE 83.187 IN THE MUNICIPALITIES OF SAN PIETRO MOSEZZO AND NOVARA ON BEHALF OF THE CONSORTIUM (CAVTO.MI.) FOR THE HIGH SPEED PROTECT TORINO-MILANO.
Location: Novara
Years: From 07/2002 to 01/2006.
Executing company works: Consorzio Agognate S.C.A.R.L.

TOPOGRAPHIC SUPPORT DURING ALLVIL WORKS NECESSARY FOR CONSTRUCTION OF RAILWAY BETWEEN THE PROGRESSIVE A.C. 98+363 AND THE PROGRESSIVE 105+684 IN THE MUNICIPALITY OF MARCALLO ON BEHALF OF THE CONSORTIUM OF HIGH SPEED TORINO-MILANO-CAVTO.MI.
Years: From July 2005 to September 2009
Executing company works: Marcallo S.C.A.R.L.

TOPOGRAPHIC SURVEYS, AEROPHOTOGRAMMETIC LEVELING AND RETURN OF DATA FOR DESIGN SECTION ALTEDO - FERRARA NORTH HIGHWAY A13.
Location: Bologna - Ferrara
Year: 2011
Executing company works: Spea S.P.A.

TOPOGRAPHIC SURVEYS, AEROPHOTOGRAMMETIC LEVELING AND RETURN OF DATA FOR THE INTERNAL TRAFFIC (ENLARGEMENT OF THE FACULTY OF ENGINEERING UNIVERSITY OF MESSINA.)
Location: Messina
Year: 1999
Executing company works: Bocoge S.P.A.

TOPOGRAPHIC SURVEY AND PLANNING OF ROAD CONNECTING KABKABIYA-EL-GENEINA
Location: Sudan
Year: 1986
Executing company works: Waterways S.R.L. Roma

TOPOGRAPHIC SURVEYS AND GEOMETRIC RE-DESIGN OF LOT 10 OF S.G.C. GROSSETO - FANO, SECTION GR-SI
Location: Grosseto-Siena
Year: 2005